Cleared for construction.✈️🛠️ Maintenance is underway on Runway 7/25!
It includes:
🚧 Full-depth 17" concrete panel replacement.
💡 Lighting upgrades.
🦺 Safety area grading.
It will be back in action this summer.
ALT Construction equipment and cones line Runway 7/25 at DEN.
ALT A portion of runway pavement in the process of being re-paved.
ALT Construction equipment on Runway 7/25 at DEN.