Filter
Exclude
Time range
-
Near
みのる retweeted
成長過程です。 ラインの少ないリアルからだんだんラインが多くなっていって、モザイクのような柄になって、そして4枚目に至ります。 極細ラインのリアル。俺1純血です。 こんなやばい柄の子まじ居ないと思います。
1
18
500
pyvh03KEq1Z3Lgt🚌oVOB😍3ru📝📡fG3we
💥ROYAL ARTILLERY EXPERIENCE💥 Come and see what life is like as a soldier in the Royal Artillery.   When? Saturday 11th July 10 – 2 Where? 1, Mitcham Road, Croydon CR0 3RU What’s there? 💥 Weapon stands 💥 The Royal Artillery’s biggest and best firepower 💥 Live demonstrations 💥 The chance to find out about life as a soldier, benefits, travel, pay and more! Click here to register for the day - eventbrite.co.uk/e/198900802…
1
8
13
1,055
#اعلانك_بسسسعر_مميززز_О54О547О49 مرة سمعت واحد يقول الراحة النفسية كنز ما يعرفه الكل واللي يفهم يفهم 3ru
1
#اعلانك_بسسسعر_مميززز_О54О547О49 صدق اللي قال لا تعطي كل الناس نفس المكانة والله 3RU
1
SemiAnalysis published an institutional note with a sub-section on the 800VDC power architecture being delayed. I don’t have access to it so I cannot comment on its contents, but I have gathered data points that I think could explain why 1. The case for 800VDC power architecture is strongest when/if total rack power need breaches 1MW – we are not there yet As I pointed out in an earlier post, Flex introduced a new 110kW 3RU power shelf for Vera Rubin NVL72 at COMPUTEX last week. These units, which are integrated into the rack, contain AC-to-DC rectifiers that convert AC input (of 345 to 480 VAC range) into 52VDC output at full load, with power distributed to rack-level payloads through a DC-DC bus architecture The latest iteration of Vera Rubin NVL72 rack has a Max P TDP of about 227kW, and incorporates 4 x 3RU power shelves for a total of 440kW rack power (4 x 110kW) The overprovisioning of rack power (~2x) is to handle power transients/spikes (especially when systems transition rapidly from idle to active state). The redundancy also ensures that the rack achieves high power availability (99.9% for AI training, 99.999% for AI inference, as stipulated by OCP) In this setup, since PSUs are integrated within the rack, there is no issue with copper busbar/overload As we move to Vera Rubin Ultra, each rack is expected to contain the same number of GPUs (72 Rubin Ultra GPUs). Assuming a per-GPU TDP of 3.6kW, total rack TDP could be over 300kW (72 x 3.6kW total GPU TDP CPU networking/switch trays overheads). When Jensen mentioned that rack power could be up to ~600kW for Vera Rubin Ultra, I believe the figure includes overprovisioning (as above). This also assumes that it is not configured in a Kyber rack design. In fact, Nvidia mentioned about the Polyphe prototype that was used in a fully functional GB200-based multi-rack NVL576 scale-up system using 8 MGX NVL racks Link: developer.nvidia.com/blog/nv… Now, things would be different with a Kyber rack design. In the same article linked above, Nvidia said that Kyber will first be introduced with Vera Rubin Ultra as a standalone NVL144 system. The number of GPUs per rack in a Kyber rack = 144, so total GPU TDP = 3.6kW x 144 = ~520kW. Accounting for system peripherals and overheads, and with overprovisioning, total rack power would most likely be >1MW. This is where 800VDC power architecture makes a difference Kyber was initially targeted for commercial launch in 2H 2027. With 800VDC power architecture reportedly being postponed to beyond 2028, this means that Kyber rack production is likely being delayed 2. Availability of 400V power architecture as an alternative While Nvidia is championing the 800VDC power architecture, three companies (Microsoft, Meta and Google) have been working on a /- 400VDC alternative, codenamed Diablo 400, which is available now and actively ramping Link: opencompute.org/documents/oc… Why 400V? It leverages on already mainstream EV technologies in charging/battery infrastructure This architecture, which features a disaggregated power rack (sidecar) to deliver /-400 VDC to an IT rack, allows scalability (to >1MW) with option to parallelize power racks together. This is an important point since it may further push out the commercial timeline for 800VDC, especially when supply chain for 400V is already established and mature In my view, for 800VDC to ramp, we also need the technology for solid-state transformers (SSTs) to develop The engineering challenge for SSTs today is to simultaneously achieve high power density and efficiency. Current SSTs have achieved power densities of ~0.1MW/m3 at 98%-98.5% efficiency – performance that is broadly comparable to conventional line-frequency transformer (LFT)-based interfaces but has not yet matched LFT efficiency curves above 99%. The target that was set at the recent APEC was 1MW/m3 with 30% lower losses than today’s SOTA SSTs While SSTs are currently in early-stage development and more costly than their LFT counterparts (at ~2x the price), the good news is that the SST ecosystem is broadening, with participation from pure-play startups (DG Matrix, Amperesand, Heron Power), PV manufacturers, UPS makers and transformer makers. The industry is also converging on the 250kW power level for the building-block single SST module. My guess on when SSTs are in good form? Probably after 2028, which coincides with the timeline set out in point one above
2
6
45
6,157
$FLEX Flex announced three new products at COMPUTEX last week which directly & indirectly supports Nvidia's AI servers: Power shelf conductive energy storage system (CESS) intermediate bus converter (IBC) 1 / 110kW power shelf for Nvidia Vera Rubin NVL72 Designed to provide rack-level power distribution. Supports modular power architectures, including future 800VDC deployments, as well as power disaggregation strategies Power shelf is air-cooled, has slots for 1 x power supply controller (PSC) and up to 6 power supply units (PSUs) PSUs and PSC are hot-pluggable (i.e., no/minimal downtime during maintenance/servicing) 6 PSUs x 18.4kW = ~110kW DC output power (max) with AC operating input voltage range of 345 VAC to 480 VAC. Each PSU comes with a power pulsation buffer device to manage AC input current swing and EDPP non-linearity Output voltage = 52V at full load that distributes power to rack-level payloads/components through a DC-DC bus architecture PSC module incorporates power & thermal management functions and telemetry/monitoring through Redfish $3665.TW BizLink supplies both the input and output connectors (by default) 2 / 30 kW Capacitive Energy Storage System (CESS) This is designed with $7220.T Musashi Seimitsu’s hybrid supercapacitors (HSCs) CESS modulates power fluctuations associated with AI/HPC workloads through energy charges/discharges during large electrical transients Lifespan is longer that existing battery energy storage systems (BESS) with multi-million charge/discharge cycles This new 30kW variant is an upgrade from the existing 16kW rated version 3 / Intermediate bus converter (BMR317) This third-gen IBC is a compact power module that steps down high primary voltage (rack/busbar) to lower intermediate bus voltage (from 40-60V input to 5-7.5V output at a 8:1 fixed ratio), and complements voltage regulator modules (for conversion to 0.5-1.8V to power processors) in a two-stage conversion pathway. The two-stage architecture uses less copper and allows shorter high-current paths at the board/package level Two variants supporting peak capabilities of up to 2kW and 2.5kW are being introduced: the 800W version which is available now, followed by the 1kW version to be released in 2H 2026 (Attached picture of the 3RU power shelf)
7
1,231
Jun 3
ICYMI, earlier this week we announced a new power shelf that supports NVIDIA Vera Rubin NVL72 platforms and future high-density AI rack architectures. The 110 kW 3RU MGX power shelf is designed for the most demanding GPU workloads, supporting up to six hot-pluggable 18.4 kW PSUs and one PSC. 🤔Want to learn more? Visit us at #COMPUTEX2026 in booth J0132 to see it yourself, or check out the datasheet for full technical details: brnw.ch/21x32uC #DataCenters #AI #Power @computex_taipei
2
135
WINNERS #MGIAllStars #MGIAllStars1stEdition MGI ALL STARS: Faith 🇬🇭 1RU: Vanessa 🇨🇴 2RU: Mariana 🇨🇿 3RU: Gazini 🇵🇭 4RU: Hương 🇻🇳 #MGIAllStars
WINNERS #MGIAllStars #MGIAllStars1stEdition MGI ALL STARS: Gazini 🇵🇭 1RU: Vanessa 🇨🇴 2RU: Faith 🇬🇭 3RU: Mariana 🇨🇿 4RU: Hương 🇻🇳 #MGIAllStars
3
3,907
WINNERS #MGIAllStars #MGIAllStars1stEdition MGI ALL STARS: Gazini 🇵🇭 1RU: Vanessa 🇨🇴 2RU: Faith 🇬🇭 3RU: Mariana 🇨🇿 4RU: Hương 🇻🇳 #MGIAllStars
2
1
20
8,965
Key $CLS products driving 2027 revenue CELESTICA (PRODUCTS & PROGRAMS (per Q1 2026 call, Apr 28) NETWORKING SWITCHES (CCS / HPS) - DS6000 — 64-port 1.6TbE, 102.4Tbps, 3RU air-cooled, Broadcom Tomahawk 6 - DS6001 — 64-port 1.6TbE, 102.4Tbps, 2OU hybrid-cooled (OCP ORv3), Broadcom Tomahawk 6 $AVGO - DS5000 — 64-port 800GbE, 51.2Tbps, 2RU, Broadcom Tomahawk 5 - DS4101 — 32-port 800G, 25.6Tbps, 1U - 400G programs — still strong, ongoing - 800G programs — multiple ramping, accelerating - 1.6T programs — 10 active, ramping heavily into 2027 KEY PROGRAM WINS / CATALYSTS - $AMD "Helios" — scale-up networking switch for Helios rack-scale AI (MI450 GPUs, UALink over Ethernet); initial units by YE2026 - 1.6T Co-Packaged Optics (CPO) Ethernet switch — hyperscaler win; Broadcom Tomahawk 6 "Davidson" CPO module; HPS program; mass production 2027 - Digital-native rack-scale program — new win, ramps late 2026 / early 2027 - AI/ML compute program — hyperscaler (enterprise end market); scaling through 2026 into 2027 - Google $GOOG TPU systems — preferred manufacturing partner; ongoing expansion COMPUTE / SERVERS (HPS) - Custom servers / ASIC-based systems - Next-gen AI/ML compute (hyperscaler) — enterprise subsegment driver STORAGE - SD6300 — 108-bay 4U JBOD, max storage density for enterprise/AI - SD-series storage platforms (AI supercomputer deployments) SILICON INPUT (supplier, not customer) - Broadcom Tomahawk 5 (800G) / Tomahawk 6 Davidson CPO module (1.6T)
3
959
New this week: Gravel on the Graves - Last Letters Scare in a Box - SOS — The Space Station is Alive! Coma Beach - The Scapegoat's Agony LunchBox President - DEATH DISC 3RU - ERU Cillian Hendi - Three Days #ambient #electronic #experimental getmusic.fm/l/Kc6u7x
1
3
5
68
Addendum. The first sign, Reed M17, can stand for the actual name for Reed, being 3ru. We still keep the following anagram. 3ru ksdm or Ur Kasdim.
8
444
@Nutanix on @Cisco brings you enterprise-grade HCI—compute, storage, and security—in a compact 3RU footprint. No more compromises for your distributed sites. See how this partnership simplifies the edge: bcove.video/3P8hSLL #Cisco #Nutanix #NEXTconf

2
3
92
🔵NEXT MATCH🔵 The Rams are on the road this weekend to face Hindley Junior Ladies! With last week's win is still fresh in their minds, they're hungry for more and ready to bring home the points! 🐏💪🏽 🗓️ Sunday 29th March 🕐 2:00PM Kick-off 📍Park Road, Wigan, WN2 3RU
1
3
101
Free download codes: 3RU - Ilúvatar "techno as cosmogony, rhythm as world-building." getmusic.fm/l/nQ3iWE #energetictechno #music
2
35
Double header tomorrow, all being well. Last week the 1sts were rained off again but tomorrow we look forward to getting back to it away with a local derby on the cards. 📆Saturday 7th March 🕝 14:30 🏆 SIL Championship 🆚 @Thurston_FC_ 📍 Thurston Playing Field, IP31 3RU.
1
1
3
289
今更すぎるけど3ruと言う名前をつけてるのだからサルにする🐵 #新しいプロフィール画像
2
59
Jan 31
We have 20 public universities in Malaysia btw. And as you can see in the infographics, our 5RU are ranked good in both QS and THE rankings. Singapore accepts med degrees from 3RU med schools to work there. (Just to explain the quality, not a good news for us coz brain drain.)
7
255