Innovative design, configurator technology and precision manufacture work together to deliver AVA, the adaptable bridge.

Joined November 2020
23 Photos and videos
28 Feb 2023
Why develop the AVA Bridge? Simple. We wanted to create a bridge that was cost, time and planet efficient and that could be adapted to any location. A modern, low-carbon footbridge. #AVABridge #footbridge #construction
108
27 Feb 2023
The average footbridge is made of steel plates and precast planks, which have been used with trusses. Not the AVA Bridge. The whole bridge is made of stainless steel. There is no other bridge like it. #footbridge #stainlesssteel #engineering
72
24 Feb 2023
Bridges like this are hard to dislike. With its many features, our favourite has to be the fact that it is adaptable to any site πŸ‘ŒπŸΌ The AVA Bridge has efficiency, design, and the planet in mind. Triple threat bridge, indeed. #design #construction #footbridge
65
21 Feb 2023
In Ancient Rome, the original footbridges were made purely from stone. Some of which are still standing today πŸ’ͺ🏼 Now AVA Bridge might not be made out of stone, but the stainless steel complex design is made to stand for the test of time. #AVA #bridge #manufacturing
1
139
17 Feb 2023
This is one of our favourites from Mr Einstein πŸ‘ŒπŸΌ Do you agree? #bridge #engineering #creativity
38
15 Feb 2023
Do you ever have those moments where you think about what things are going to look like in the future? Look no further πŸ‘πŸΌ The one and only AVA Bridge! Designed and manufactured like no other footbridge on the market. #ThisisAVA #construction #engineering
2
78
13 Feb 2023
Bridges like this are hard to dislike. With its many features, our favourite has to be the fact that it is adaptable to any site πŸ‘ŒπŸΌ The AVA Bridge has efficiency, design, and the planet in mind. Triple threat bridge, indeed. #design #construction #footbridge
27
10 Feb 2023
A project like the development and rollout of the AVA Bridge requires a solid team with the ability to overcome challenges, patience, and a passion for innovation. Phil from Walker Construction has been at the helm of the AVA Bridge project. #projectmanagement #construction
4
91
When we looked at creating this future bridge, we wanted to make it out of this world. Here are some of the things we had in mind: β†’ Accessible and safe for everyone β†’ Cost-effective and planet friendly Find more: avabridge.com/#about #AVA #manufacturing
1
55
11 Nov 2022
AVA Bridge must have all the nuts and bolts possible πŸ˜… Question is, can anyone guess how many nuts and bolts there are in one AVA Bridge? Have your guess πŸ‘‡πŸ» #takeaguess #construction
1
10 Nov 2022
Ever wondered what the brief of AVA Bridge was? Well, it was all about challenging the norms of the railway footbridge world. We’re definitely not joking when we say this beauty is the future of railway engineering. 😁 #AVABridge
24 Oct 2022
Hi @coventrycc, we are AVA Bridge and Lifts πŸ‘‹πŸΌ #coventry train station looks great recently. Imagine our #AVABridge and #AVALifts in position adding those finishing touches? πŸ‘€ Designed with time, cost and planet efficiency in mind, they are the triple threats of the rail world
21 Oct 2022
The countdown is on… Not long until the launch of our first #AVABridge build 🀩 #AVABridge #footbridges
21 Oct 2022
β‡Ύ Specifically designed to suit NR installation with a new or existing Footbridge β‡Ύ Configurable to work with AVA or other bridges β‡Ύ Minimum on-site work. They are plug and play! It’s not just triple threat bridges we specialise in. Meet #AVALifts πŸ‘‡πŸΌπŸ‘€
19 Oct 2022
People of Twitter, we need your help! This is Phil, the man at the helm of #AVABridge project. Outside of work, Phil likes to hit the tarmac as a keen cyclist living that lycra life! Reckon we can get Phil to do some branded lycra for the launch in November? πŸ˜‚ #lycraphil
1
2
19 Oct 2022
Wondering what it takes to build a #footbridge that is time, cost and #planetefficient? πŸ€”πŸ’­ The fantastic team behind the #AVABridge share their insights in the video belowπŸ‘‡πŸΌ youtube.com/watch?v=Bgy7jNFl… #engineering #construction #avabridge
17 Oct 2022
A configurable footbridge kit, designed with time, money and planet in mind. β‡Ύ Components can vary in scale or number β‡Ύ They can be tuned up or down depending on the height you need the bridge to be β‡Ύ Bridge spans can be configured for 1 to 6 tracks #avabridge #contruction
17 Oct 2022
In comparison to the average #footbridge, fitting an #AVABridge at a new station takes 3-4 months. 3-4 months! 😱 Significantly quicker, 25% cheaper, and more #sustainable. The triple threat of the footbridge world πŸ‘‡πŸΌ avabridge.com/ #avabridge #construction
14 Oct 2022
Made completely of #stainlesssteel. 25% cheaper than a traditional #footbridge build. And significantly faster with a 3-4 month complete turnaround. Have we got your attention? This is the #AVABridge πŸ‘‡πŸΌ avabridge.com/
14 Oct 2022
Made completely from stainless steel, with 5% welding, the AVA bridge is one of the most #sustainablefootbridges available on the market today. It’s a bridge that can be recycled! Find out more via the link below ⬇️ avabridge.com/ #recycle #innovativedesign