Rapid deployment Reliable access = The Beaver Kit Bridge (BKB) at Bishopsbridge 🌉
Last month, we completed the installation of a new pedestrian bridge at Bishopsbridge, Market Rasen, on behalf of our client, Jackson Civil Engineering, for the Environment Agency.
Project Highlights:
📍 Location: Bishopsbridge, Lincolnshire
🛠️ Client: Jackson Civil Engineering
🚧 Scope: 10m x 1m Beaver Kit Bridge (BKB) Installation
The project required a fast, efficient solution to replace vital, local access over the watercourse.
We deployed our signature Beaver Kit Bridge (BKB), our premier entry-level modular steel system that's designed specifically for rapid assembly and cost-effective delivery. The BKB is the ideal choice for sensitive or restricted environments where speed and accessibility are paramount.
By utilising our tried-and-tested in-house BKB solution, we:
- Maximised efficiency with a modular, "bolt-together" design.
- Reduced lead times and onsite requirements.
- Minimised on-site disruption while ensuring a high-quality, durable asset was delivered and installed on schedule for this key local connection.
By utilising our tried and tested in-house kit solution, we minimised on-site disruption while ensuring a high-quality, durable asset was delivered and installed on schedule for this key local connection.
Another example of Beaver Bridges' end-to-end expertise and scalable, sustainable solutions, designed specifically for the hosting environment, that we’re proud to put our name on.
"Those who say it cannot be done, should not interrupt those doing it.’’