The official account of China Civil Engineering Construction Corporation.

Joined October 2018
841 Photos and videos
Jun 12
The Bahi Station Transshipment Project on Tanzania’s SGR Line 5, built by CCECC, has officially begun operations. Located near Dodoma, it serves as a key logistics hub, strengthening the rail freight network and improving the efficiency of regional logistics across East Africa.
1
7
29
3,388
Jun 5
The CCECC UAE Railway Phase II Project spans 424km of railway line and 650km of track. Comprehensive environmental surveys, wildlife monitoring, and relocation measures were carried out to help protect ecosystems along the route, including areas near the Misanad Protected Area.
1
3
3
392
Jun 4
The Addis Ababa BRT B2 Pilot Line Depot Project in Ethiopia, built by CCECC, has started foundation concrete works for its administration building. Covering nearly 60,000㎡, the project will support the city’s BRT system and new-energy public transport services.
2
3
13
851
Jun 1
On International Children’s Day, CCECC marks its 47th anniversary. From the Tanzania–Zambia Railway to Belt and Road projects, we continue connecting communities and building enduring links across the globe.
1
3
371
May 28
The Dakar 2026 Youth Olympic Games sports infrastructure project, constructed by CCECC, has entered the final stage of interior finishing and equipment commissioning. Covering approximately 50,000㎡, it includes multiple sports venues and upgraded community facilities.
1
4
440
May 20
Two new industrial facilities have commenced operations at the 𝑳𝒆𝒌𝒌𝒊 𝑭𝒓𝒆𝒆 𝒁𝒐𝒏𝒆 in Nigeria, developed by @CCECCNigeria. These projects—a building materials production line and an agro-input facility—are set to boost local supply capacity and create new employment opportunities in the region.
5
43
147
4,538
May 17
Project Update | Djibouti CCECC has signed the Phase II and III works of the ATLS Oil Tank Storage Foundation Treatment Project at Doraleh Multipurpose Port. Covering 11.4 hectares, the project will support the development of energy storage and transportation infrastructure.
3
8
508
May 10
From home to the wider world, we set out to explore new places, always carrying a mother’s quiet love with us along the way. On 𝑴𝒐𝒕𝒉𝒆𝒓’𝒔 𝑫𝒂𝒚, CCECC pays tribute to all mothers. Wishing you kindness and lasting happiness.
2
2
6
378
May 9
Sections 1 and 2 of the Battambang Water Supply System in Cambodia, built by CCECC, are now operational. The project includes a 50,000-ton/day water treatment plant and 96km of pipelines, serving over 80,000 residents and improving access to tap water.
3
4
430
May 8
Happy World Smile Day! A smile is a simple way to connect with others. On project sites around the world, it builds trust and reflects both professionalism and warmth. Today, let’s start with a smile.
1
4
282
May 1
Roads stretch, bridges unite, and cities evolve—driven by the steady work of countless builders. Across the world, we help shape infrastructure that enhances connectivity and everyday life. Today, we honor every worker.
1
2
321
Apr 30
The Shoulder to Shoulder on the Same Path exhibition, themed on the TAZARA Railway, has opened in Lusaka, Zambia. Featuring works by Zambian and Chinese artists, it brings to life the landscapes and stories along this enduring “friendship road.”
1
3
295
Apr 24
The NRS headquarters in Abuja, built by @CCECCNigeria , is now operational. The 16-floor complex includes three towers for over 3,000 staff, integrating administration, data processing, and public services.
27
253
1,122
46,270
Apr 22
Happy World Earth Day! From connection to coexistence—on the 𝑹𝒆𝒆𝒎 𝑰𝒔𝒍𝒂𝒏𝒅 𝑩𝒓𝒊𝒅𝒈𝒆 𝑷𝒓𝒐𝒋𝒆𝒄𝒕 in Abu Dhabi, CCECC minimized impacts on mangroves and supported ecological restoration, helping around 6,000 mangrove trees thrive along the coast.
7
869
Apr 16
The Angiama-Oporoma bridge in Bayelsa State, built by CCECC Nigeria, has been completed and opened to traffic. The 630m bridge across the Nun River improves connectivity between Yenagoa and Southern Ijaw, replacing ferry transport and enhancing travel and freight efficiency.
13
148
381
13,964
Apr 12
The Huancavelica Highway Project in Peru, built by CCECC, has been completed. The 207.8km route cuts travel time from 16 to 6 hours, improving connectivity in Peru’s highland region and supporting regional development.
2
9
831
Apr 2
The Ethiopian Electric Power Research and Development Center Project, built by CCECC, has reached a major construction milestone with the structural topping-out of its main building—the largest office building within the development. Located in Addis Ababa, the project has a site area of approximately 150,000 m², with a gross floor area of around 120,000 m². Throughout construction, the team optimized planning through BIM modeling and leveraged digital platforms to support integrated project management. Close collaboration between Ethiopian and Chinese teams, supported by bilingual technical briefings and joint safety inspections, has ensured steady progress.
2
13
901
Mar 29
Ethiopia’s National Bank branch project reaches a new milestone–the main structure of the Dire Dawa branch has been successfully topped out! This is another significant milestone for the series of projects, following the Hawassa Branch. Located in the heart of the city, the project spans approximately 22,000 ㎡ and boasts comprehensive facilities. With this key node completed, the project is entering a new phase, and construction is steadily progressing on site.
1
14
1,053
Mar 22
CCECC signed the Shinyanga Water Supply Project in Tanzania. The project, located in Shinyanga Municipality, will include new water reservoirs, towers, and related facilities, as well as the rehabilitation of existing systems. It also covers the laying of 287 km of distribution pipelines, household connections for 2,000 families, and 30 automated water kiosks. Once completed, it will provide safe and clean drinking water to around 200,000 residents in the area.
4
12
944