Collett have successfully delivered the first two turbine blades to Sanquhar II Wind Farm. This represents a significant milestone for both the project and Collett, marking the first time both blade lifters have been used together in convoy.
6
434
Collett have been shortlisted for Specialist Operator of the Year at the 2026 @Motor_Transport Awards. The category recognises operators working within highly specialised sectors of the road freight industry. Congratulations to all those shortlisted.
2
172
Collett delivered an 89.9T Hyosung transformer to National Grid’s Bicker Fen Substation using a specialist bridge over bridge system to overcome a 3T bridge restriction near site. Read more: collett.co.uk/bridge-over-br…
1
7
401
We’re proud to be sponsoring Crofton Juniors U7 Girls Lightning and supporting the team with their new away kits. It’s great to be involved with grassroots football and support young local teams enjoying the game, while also helping give something back to the community.
127
More from Windy Standard III Wind Farm. Phase A is complete, marking a major milestone with 8 of 20 turbines now transported to site. The project now moves into Phase B, with a further 12 Enercon E138 turbines scheduled for transport later this year.
1
5
197
A successful first day at the All-Energy Exhibition, a great opportunity to showcase our specialist transport operations spending time with our valued clients. If you didn’t get the chance to speak with our team yesterday, visit us at Stand G41 for day two!
2
133
Windy Standard III tower deliveries in action! Phase A of the project nearly complete with 88 components delivered for 8x Enercon E115 turbines. Phase B follows later this year with 156 components for 12x E138 turbines. #HeavyTransport #WindTurbineLogistics
6
289
As the 2025/26 season ends, a huge shoutout to Stan Moody on another brilliant year. Breaking into the world’s top 40, reaching two ranking quarter-finals and making his Crucible debut. Proud to have supported Stan since 2021 and excited for what’s next.
1
114
When the route says no, engineering finds a way. Delivering an 89.9t transformer to National Grid’s Bicker Fen Substation, our team faced a 3t bridge restriction less than a mile from site A specialist bridge over bridge system was deployed to continue safely. Wider operation
12
1,282
Collett are transporting three 31Te tanks to Bradford Energy Centre. At 4.63m wide, these Hartwell Manufacturing units are moved on vessel bridge trailers, allowing the load to sit between the beams to reduce the overall height.
1
4
27
708
Huge congratulations to Stan Moody on a fantastic performance to advance in the World Snooker Championship! 🎱 Stan showed incredible composure to navigate a tough match. As his main sponsor, we’re proud to support an Expert in Motion. Good luck Stan! We're right behind you.
150
Tonight we’re at the 2026 ESTA Awards, a benchmark for the heavy lift industry! Collett is a finalist in: 🔹 Abnormal Transport >120Te 🔹Abnormal Transport ≤120Te Good luck to all the finalists celebrating industry excellence!
3
138
Introducing our latest fleet upgrade: a Volvo FH540 6×2 tractor unit paired with a Fassi F905R-HXP Techno crane. Delivering strong reach, lifting performance and reliability, this addition increases our capacity to handle larger and more complex lifting and transport requirements
5
207
Collett has completed the installation of a 120Te Hyosung transformer at National Grid’s Wymondley substation. Using jacking and skidding equipment, it was loaded onto our 6-axle SPMT, transported across site, and positioned onto its final plinth.
6
212
Last month, we visited Goldhofer in Memmingen to take delivery of our new FTV 850 Blade Lifter. Operational later this year, it strengthens our capability to deliver complex projects with limited access and larger turbine designs.
2
190
We’re excited to share that Collett has been shortlisted as finalists in not one, but two categories at the 2026 ESTA Awards of Excellence! Abnormal Transport > 120Te Award Abnormal Transport ≤ 120Te Award #ExpertsInMotion #ESTAawards #ESTAEurope #Awards #Shortlisted
9
252
220 concrete bridge beams. 9,042 Tonnes moved. One project. Collett delivered 220 beams for the River Blythe Viaduct on the HS2 route, transported from Melton Mowbray to site. Delivered in phases over 14 months using specialist trailers and police escorted movements.
1
16
388
International Women’s Day is this Sunday and we wanted to take this time to recognise the women in our organisation. Thank you to the women, not just in our organisation but including our valued clients, we hope you have a great day.
1
110
Today is Employee Appreciation Day and we want to recognise the people who keep Collett moving. Whether it’s delivering key infrastructure, coordinating projects or keeping operations running, every team member plays a part. Thank you for all you do.
1
97
It’s great to receive positive feedback after delivering three wind turbines to Dragon LNG, Pembrokeshire. The 39 components were carefully transported along local roads and delivered safely. Richie Hull, Project Manager at Dragon Energy Ltd, commented:
1
190