Joined November 2023
85 Photos and videos
This stunning build by @t_riple9 is now prepped to train our teams in emergency response driving—while showcasing the unique capabilities of a full EV. #Rumbler #DTU #EV @EastEnglandAmb
1
2
59
3,552
EEAST_OpSupport retweeted
15 May 2025
This is bloody beautiful this car…. What you think? 🤔 comments below 👇
7
3
64
4,850
Its been an epic 18months here at @EastEnglandAmb with over 15 different new vehicle types coming into operation. More to come over the next 2 years and then on to the project of BEV 💚⚡
3
56
3,286
Some bank holiday disco lights to brighten day 😄 you wont miss these coming towards you
6
4
97
5,657
These @mantruckbusuk @WASAmbulances will be a very familiar sight in @EastEnglandAmb over the next 5 years with over 360 more joining the fleet in the next 2 years. Looking great in the glorious sunshine
13
2
98
8,594
For those wanting an indepth look at our amazing @EastEnglandAmb Bariatric and complex patient vehicle check out this video by Brad @RescueFitUK youtu.be/Dx4WeUX8zMo?si=Ad6o…

1
3
24
5,882
Another 89 @EastEnglandAmb @mantruckbusuk vehicles rolling off the production line thanks to @WASAmbulances 🥳
8
7
91
9,442
Bored child this half term??? Were looking for designs for our new batch of DTU cars with a childrens competition. Full details eastamb.nhs.uk/newsroom/your… @EastEnglandAmb
1
5
43
4,210
Very brief show around of the new DTU training vehilce 🥳
1
5
71
5,851
Been a while since weve had a gratuitous blue light vid 🤣 out new fully electric RRV ⚡⚡
3
2
103
7,432
Busy busy busy at the moment!!! New @SKODAUK EV RRVS, new @mantruckbusuk driver training vehicles and new DSAs being comissioned and released into @EastEnglandAmb frontline operations 🥳🥳🥳
6
2
86
7,174
Ever wondered what goes into building an @EastEnglandAmb with @OHVConversions? A start to finish timeline below
12
5
97
19,455
The finished article 🚨🚨🚨
16
2,530
The intellitec control system in use for the first time in an EEAST vehicle
10
2,395
Through to final fit. Looking great. Internal layout designed by a multi user group to make sure its user friendly for both operational staff and mechanics
1
10
2,271
First fit cabinetry, all starting to come together now
10
2,106
Livery next 🥰
12
2,027
Starting to look more like an ambulance now with the walls and flooring ready for the stretcher mounting system
9
1,949
Insulation is then added and the first stage flooring
9
1,921
The control systems and additional "brains" added
12
1,871
First fit electricals and AC is fitted. Approx 3km of wiring is needed in each DSA
1
9
1,962