What Determines How Hollow Pots are Arranged on Site?
Captured in the footage is an active site in Kiambu🇰🇪 code named Project Red Ochre
#UsidanganyweNaFundi#AskFOS
How to Lap Steel Rebar for Reinforced Concrete Beams via Cranking
Captured in the footage is an active site in Mwihoko🇰🇪
We are FOS Engineering Solutions.
#UsidanganyweNaFundi#AskFOS#RebarCranking
Corner Detail for Reinforced Concrete Underground Water Tank, Lift Shafts, Retaining Walls etc
Captured in the footage is an active job site in Diani🇰🇪 code named Project Henna Palace
We are FOS Engineering Solutions.
#WaterTank#UsidanganyweNaFundi#AskFOS
Concreting a Test Pile - What a Concreted Pile Looks Like
1. Surface soil is too weak to support the structure.
2. Loads are very high, so need to be transfer to the hard strata.
3. The site has poor drainage or chances of waterlogging is too high
(Thread)
How Concreted Column Pad Footings And Strip Footings Look Like
Captured in the footage is an active job site in Juja Farm🇰🇪
We are FOS Engineering Solutions.
#UsidanganyweNaFundi#PadFootings#Foundations#AskFOS
Schmidt Hammer Test - Surface Preparation and Testing
Captured in the footage is an active structural retrofit site in Kisumu🇰🇪
We are FOS Engineering Solutions.
#NDT#SchmidtHammer#ReboundHammer#RetrofitSite
Structural Engineering Inspection of Sample Timber Truss on Site. We checked for:
1. Type of timber
2. Preservative treatment of timber
3. Dimensions of timber
4. Nailing detail.
5. Joint splicing detail
(Thread)
Captured in the footage is an active site in Machakos🇰🇪 code named Project Black Swan
We are FOS Engineering Solutions
#UsidanganyweNaFundi#AskFOS#RoofTruss
Progress images for the roofing works of our high end residential maisonette. Works done thus far:
•Setting out for walling of attic floor✅️
•Ring beam✅️
•Setting out for trusses and rafters✅️
•Erection of trusses and rafters✅️
•Bolting of wall plates✅️
(Thread)
•Fixing of purlins ✅️
•Fixing of battens ✅️
•Concreting of rafter beams (ongoing)
Captured in the images is an active site in Bustani🇰🇪
#UsidanganyweNaFundi#AskFOS#Bustani#Roofing
How to Correctly do Steel Fixing for a Bevel Detail for Water Retaining Structures and its Importance
Captured in the footage is an active site in Diani🇰🇪 code named Project Henna Palace
#UsidanganyweNaFundi#AskFOS#Wateeproofing#BevelDetail
Correct Steel Fixing for Column Links
Captured in the footage is an active site in Diani🇰🇪 code named Project Henna Palace
We are FOS Engineering Solutions
#UsidanganyweNaFundi#AskFOS#Links#Columns
Wrong Installation of Waterbar in a Water Tank❌️
Captured in the footage is an active job site in Bustani🇰🇪
We are FOS Engineering Solutions
#UsidanganyweNaFundi#AskFOS#Waterbar
Coverage for Damp Proof Membrane (DPM) for Ground Floor Slabs
Captured in the footage is an active site in Diani🇰🇪 code named 'Peoject Henna Palace'
We are FOS Engineering Solutions
#UsidanganyweNaFundi#AskFOS#DampProofMembrane#Waterproofing
Coverage for Damp Proof Membrane (DPM) for Ground Floor Slabs
Captured in the footage is an active site in Diani🇰🇪 code named 'Peoject Henna Palace'
We are FOS Engineering Solutions
#UsidanganyweNaFundi#AskFOS#DampProofMembrane#Waterproofing
Performing Ultrasonic Pulse Velocity (UPV) Test during a Structural Audit exercise of an existing building. The aim is to establish the quality of concrete mix of structural elements on site.
Captured in the footage is an active structural retrofit site in Kisumu🇰🇪 .
(Thread)
The aim is to establish:
1. The homogeneity of the concrete
2. The presence of cracks, voids and other imperfections
3. Changes in the structure of the concrete which may occur with time
4. The quality of the concrete in relation to standard requirements