Joined June 2009
2,510 Photos and videos
Pinned Tweet
5 Feb 2021
Screenshots from my phone of #OsmAnd set up to use #CyclOSM as a background map with the Waymarked Trails route lines as an overlay. @ramthelinefeed
1
4
Replying to @joncstone
@joncstone (Future C13) cycle tracks on Clerkenwell Rd opened today. bsky.app/profile/maclondon.b… Pic=One way to use the new infrastructure in a longer route to connect from northbound C6 branch to C41. I don't think you've gone via the picturesque Doughty Mews (red box) in a video.
2
4
137
@joncstone The interim infrastructure on Arthur St.
1
34
MacLondon retweeted
📢 Big News: Romford Road Section H is OPEN! 🚲🚶‍♂️ We’ve officially hit a major milestone for a greener, safer neighborhood. Section H is now open, featuring dedicated improvements for: Pedestrians: Wider, safer walkways for a better walking experience.
1
6
16
1,015
Replying to @joncstone
@joncstone Some bits to be aware of: Some recent contraflows introduced in Fitzrovia (red circles). The orange box has one sign (pic 3) <inconvincingly> suggesting that it currently has a contraflow. I suspect C27 will get realigned via Gt Titchfield St (TfL map uses this).
2
2
135
First section of C43 (red box) is now signed, although might need another day's work to complete the road markings and properly sign the contraflow on Portsea Place. Drawings also suggest a couple of islands will come at the north end of the 2 contraflow streets. Purple=C-links
1
72
C48 is now fully signed between Brockwell Park and "Valley Road" mostly along what had been part of the Streatham-Peckham Rye scheme. (There's also a signed offshoot C-route to Streatham.) The Christchurch Rd crossing (black box) is supposed to be getting improved soon.
1
1
153
4 Nov 2021
Some suggestions for @FootwaysLondon in Hackney: (1) There are some missing sections of a signed pedestrian/cycle route between Finsbury Park Victoria Park (delivered for 2012 Olympics) - cycling.waymarkedtrails.org/…
2
2
4 Nov 2021
It might be better to map this @FootwaysLondon route via the staggered pelican crossing on Mare St the south side of St Thomas's Sq. The central cycle track on Mare St wasn't designed/intended to be used as pedestrian refuge island.
2
2
23 Nov 2025
@FootwaysLondon Hackney have recently installed a new crossing on Mare St. (Work was related to the relocation of 2 bus stops.)
1
66
30 Aug 2025
All the road changes for the Chatsworth Rd Liveable Neighbourhood have now begun in Hackney. @joncstone @SafeCycleLDN bsky.app/profile/maclondon.b…

1
202
20 Jun 2025
Replying to @joncstone
@joncstone In case you haven't seen them, these are the new monster cycle tracks in Meridian Water, running around 3 sides of the former Ikea. Mostly built, though not completed yet at the SW corner of IKEA.
4
6
983
20 Jun 2025
@joncstone Some details on the new Cycleway 66 at bsky.app/profile/maclondon.b…

2
240
16 May 2025
Not yet properly marked etc, but the new (raised) C16 crossing on Olympic Park Ave is now 'open'. @joncstone bsky.app/profile/maclondon.b…

150
2 May 2025
Replying to @joncstone
@joncstone The North Woolwich Rd cycle tracks are basically finished now, BUT...
1
3
185
2 May 2025
... the Silvertown Way viaduct will become one-way southbound in a few days for several months, with northbound traffic going via Dock Rd (the 'old road' is already one-way). Cycling diversion route will be two-way using Dock Rd. A wanded two-way cycle lane has been installed.
1
2
157
1 May 2025
Finsbury Park Road... minus Thames Water works!! 😲 @joncstone @EdmondChuiHW
1
1
9
1,339
15 Oct 2024
Traffic is fully back onto the roadway on Waterden Rd outside the housing development. Looks like the planned relocation of the disused zebra crossing near Parkes St junction might finally be under way. @joncstone @richardavsmith @raynoldchow @EdmondChuiHW
1
3
335
15 Oct 2024
The Red Path's joints are really not ageing well just east of where it passes over one of the A12 carriageways. Presumably they do carry out safety checks on bridges like this? @EdmondChuiHW
3
2
270
4 Apr 2025
Hackney's Red Path is looking much better now following it's recent improvements.
5
111
22 Jul 2024
Around Connaught Bridge area. At the surviving roundabout, the parallel crossing has opened. Final layer is not yet in for the rideable two-way cycle track. 2 errant bollard discs have been corrected... but the last one in video is wrong. @EdmondChuiHW @joncstone @SafeCycleLDN
2
1
5
767
16 Feb 2025
Errant bollard disc has finally been corrected.
1
108
13 Feb 2025
Resurfacing (?this week) has delivered the planned parallel crossing on Thames Rd (Silvertown) although Belishas needed activating before it actually opens. Also within the boxed area on the map (at the former roundabout), the junction with North Woolwich Rd has been raised.
2
136
22 Jan 2025
Replying to @joncstone
@joncstone @SafeCycleLDN You should find some useful bits of cycling updates among what I've posted in the last few days at bsky.app/profile/maclondon.b…

2
2
196
13 Feb 2025
@joncstone @SafeCycleLDN Some more updates, including the big new changes on/around Lambeth Bridge at bsky.app/profile/maclondon.b…
1
1
120
23 Jan 2025
Apparently the end of Bodney Rd will open tomorrow. Give-way markings at both ends of the narrowed ending and at least 1 big 🚲 logo visible, so I expect this is indeed a modal filter. Estate fencing went in this week & the works compound is largely cleared out now. @ripley226
1
4
185
24 Jan 2025
Now open, but needs some new signs ( ?bollards) installed at the apparent modal filter.
1
3
112
21 Jan 2025
The 2 new-ish Silvertown crossings I previously thought were 'incorrect' pelicans have now had their🚦converted to toucan crossings, though they're not yet operational. @raynoldchow @EdmondChuiHW @richardavsmith @joncstone @hackney_cycling @NewhamCyclists x.com/MacLondon/status/18612…
26 Nov 2024
Replying to @MacLondon
At southern end of Silvertown Way, at least the (pelican) crossing in pic 1 should be a toucan. @NewhamCyclists I'd also have expected the pelican crossing in pic 2 to be a toucan, especially for southbound cyclists from Dock Rd.
2
5
443
22 Jan 2025
Those 2 crossings that recently got toucan🚦installed... are now fully operational. The new path on North Woolwich Rd (heading towards Dock Rd) is now finally signed as shared use.
85
21 Jan 2025
At Tidal Basin Roundabout, some🚦are now operational. The 3 crossings at the end of Lower Lea Crossing are now (permanent) toucan crossings instead of the inital (temporary) pelican 'dismount' crossings.
3
89