In this hallway from 2 Remake, there's the most subtle connection to Outbreak. With exactly 2 windows barricaded here, it lines up perfectly with "Desperate Times" where zombies smash through these same windows. That's days before RE2 so RPD cops had time to board them.
#REBHFun