UDOT Region One covers Davis, Weber, Morgan, Box Elder, Cache and Rich Counties. Administrative offices are located at 166 West Southwell Street, Ogden.
NB Legacy PKWY from Parrish Ln in Centerville and Park Ln in Farmington closed nightly 9PM to 5AM Mon., June 15, through Thurs., June 18, for overhead signage removal. Traffic will be detoured to NB I-15 at the Parrish Ln. interchange in Centerville.
INFO: udotinput.utah.gov/legacypar…
Overnight work on the US-89/91 and SR-23 Wellsville RCUT project will occur June 14–30 from 9PM to 10AM. Expect reduced speeds, lane closures, increased construction noise and vibration, and additional truck traffic in nearby areas. Please slow down and use caution in work zone.
🚧I-84 CLOSURE IN WEBER CANYON🚧
EB I-84 will close from 9:30AM Sun (6/14) through 4AM Mon (6/15) as crews install bridge beams east of the mouth of the canyon, over the Weber River. DETOUR: SR-39 though Ogden Canyon or I-80 through Parleys Canyon.
INFO: udotinput.utah.gov/i84weberb…
Starting as early as 10PM Thurs., June 11, through 6AM Fri., June 12, the SB Legacy PKWY on-ramp at Park Ln. in Farmington will close for traffic signal work.
Drivers can detour to Parrish Ln. in Centerville to access southbound Legacy PKWY.
INFO: udotinput.utah.gov/shepardla…
Box Elder County commuters:
Work on SR-13 through Corinne starts 6/15. Drivers can expect one-way traffic & delays up to 15 minutes nightly from 7 p.m. to 7 a.m., Sunday nights to Friday mornings. Weekend night work may take place if needed.
INFO: publicinput.com/sr13renewed
BRIGHAM CITY: Safety and accessibility
improvements coming to SR-13 (Main Street).
Work has started on five intersections with
upgrades to signals, sidewalks and more. Expect
lane shifts.
Learn more: udotinput.utah.gov/r61875
The SB SR-177 ramp to Legacy PKWY (Exit 1B) will close Saturday (6/6) from 6 a.m. to 6 p.m. for ramp repair work.
Drivers can detour by taking SB I-15 to Parrish Lane, then by traveling west on Parrish Lane to access the Legacy Parkway on-ramps.
INFO: udotinput.utah.gov/legacypar…
DAVIS DRIVERS: EB and WB Park Ln from Station PKWY to Legacy PKWY reduced to one lane, SB Legacy ramp at Park Lane closed. 10:30PM 5/29–9:30AM 5/30. Use caution, expect delays, and follow signage. Closures will allow for work on nearby bridge.
INFO: udotinput.utah.gov/shepardla…
LOGAN COMMUTERS: US-89 (Main Street) at the Logan River Trail Undercrossing returns to 2 lanes each direction this weekend. There will still be some occasional lane shifts, but major delays are over.
INFO: udotinput.utah.gov/loganunde…
801-838-8361
UDOT will detour trail users around part of the Legacy Pkwy Trail from 2425 S to 500 S. in Woods Cross starting 5/18 through July for noise wall work. Please use the trail on the west side of Legacy Pkwy to safely avoid the work zone.
INFO: udotinput.utah.gov/legacypar…
Lane closures are planned on Legacy Pkwy 5/15 – 5/21 for bridge demolition and paving.
Expect delays with lane closures in both directions over the Jordan River bridge and periodic northbound lane closures between Center St and 500 S.
INFO: udotinput.utah.gov/legacypar…
NORTHERN UTAH COMMUTERS: On May 11, 12, and 15, up to 3 lanes on NB and SB I-15 will close between Burton Lane and State Street for bridge work. Lanes will start closing at 9 p.m. each night and will be open by 7 a.m. the following morning.
INFO: udotinput.utah.gov/shepardla…
🚧FARMINGTON COMMUTERS: 900 N. at Main Street will close May 18, 2026 for road work. Expect alternate northbound and southbound traffic controlled by a temporary signal between 947 N and 715 N on Main. Detours in place. Please plan ahead.
INFO: udotinput.utah.gov/farmingto…
Overnight ramp and lane closures on I-15 between Roy Riverdale tonight, May 8-9 from 7 p.m. to 5 a.m. as crews add a fourth NB lane on I-15. Expect delays and visit the project website for detour information: udotinput.utah.gov/5600south
Up to three lanes on NB and SB I-15 will close nightly May 4–8 between the Burton Lane overpass in Kaysville and the State Street overpass in Farmington for bridge work. Lanes close at 9 p.m. and open by 7 a.m.
INFO: udotinput.utah.gov/shepardla…
Overnight Ramp Closures at I-15 and 5600 S (May 3–6)
7PM–5AM nightly for final paving:
• Sun: SB off / NB on-ramp
• Mon: NB off / SB on-ramp
• Tue: Intermittent (north side, WB)
• Wed: Intermittent (south side, EB)
MORE INFO: udotinput.utah.gov/5600south.
MAY 2, NIGHT CLOSURE – 5600 S and 1900 W
8 PM–1 AM: Lanes reduced, NB/SB traffic maintained
1 AM–7 AM: FULL intersection closure
Local access maintained. Detours via city streets. Expect delays, plan ahead and use
caution. MORE INFO: udotinput.utah.gov/5600south.
Work on US-89/91 at SR23 (Center St) in Wellsville will begin 5/4/26. The project includes the construction of a Restricted Crossing U-Turn (RCUT) intersection. The project is estimated to be completed in Fall 2026. For more info, visit publicinput.com/us8991rcut
LOGAN COMMUTERS: US-89 at 600 S. will be down to one-lane of traffic in each direction, starting tonight (4/29).Plan on delays ad use zipper merge to reduce congestion. INFO: udotinput.utah.gov/loganunde…youtu.be/qQ9j9FO_nrc?si=pjNE…
🚧Cache Valley drivers: the south side of the SR-23 and SR-30 intersection will close May 2-10, 2026 for road work. Expect one lane each way, 50 mph speed limit. Detours in place - plan ahead!