18 Years - 40 Devices | M.B;B.S. ; M.D. (Medicine); PGCIH | Fellow in 2D Echocardiography

Joined April 2011
1,020 Photos and videos
Pinned Tweet
Jan 1
Expanding Web Application tools with new Tools!! ✨ This new year I present you a free / non profit Medical Tool for OPD / Ward use. (LDL Cal tool Expanded) tools.drmjp93.in (Direct Use) Tweet (1/3) Report > 2/3 How to install as app > 3/3 Reposts appreciated!!
26 Sep 2025
I often needed a: quick (no-login) LDL calculator based on Indian guidelines — so I made one. ➡️ drmjp93-ldlcal.netlify.app Free, mobile-friendly, and perfect for clinic use. Feedback welcome! #MedTwitter
1
1
2
499
Mit retweeted
Ahmedabad Plans to Shut Six SG Highway Cuts; ISKCON-KD Hospital Stretch to Go Signal-Free deshgujarat.com/2026/06/15/a…
2
13
110
6,858
Mit retweeted
Incredible setup
389
835
5,872
1,750,432
Mit retweeted
New Route of Sabarmati – Veraval Vande Bharat Express to Cut Travel Time Despite More Stops deshgujarat.com/2026/06/13/n…
4
67
2,441
Mit retweeted
Gujarat's Port City Vision Moves Forward 🔥🔥 The Gujarat Maritime Board has floated an RFP for DPR & Detailed Engineering Design of a proposed Port City at Maroli, near Vapi. 🔹 Mega port with 500 MMTPA cargo handling capacity 🔹 Port-led city spanning 350 sq. km 🔹 Integrated industrial, logistics, residential & commercial zones 🔹 Multimodal road and rail connectivity The proposal could revive Gujarat's long-planned Port City vision in south Gujarat and emerge as a major logistics and industrial hub.
8
51
330
9,440
Mit retweeted
SMC Extends Dumas Sea Face Visiting Hours deshgujarat.com/2026/06/12/s…
5
54
1,886
Mit retweeted
Ahmedabad Metro Phase III Moves Ahead 🔥🔥🔥 GMRC has invited tenders for detailed topographical surveys for the proposed Phase III corridors. 🔹 Phase III(B) ▪️ 19.886 km elevated corridor ▪️ 12 elevated stations ▪️ Route: Godhavi to Badrabad 🔹 Phase III(A) ▪️ 3.313 km elevated corridor ▪️ 3 stations ▪️ Route: Thaltej Gam to Canal Road 🔹 Phase III(C) Ring Corridor ▪️ 36.169 km elevated corridor ▪️ 26 elevated stations ▪️ Route: APMC End to APMC End Total planned length: 59.37 km Total proposed stations: 41
6
26
243
7,019
Mit retweeted
Jun 10
Sachh 😭
35
87
846
45,928
Mit retweeted
Starting OP in our new facility tomorrow! Op room with a view. New beginnings! Send me good juju😍 KIMS hopsital, Kondapur right opposite the current facility.
82
4
429
114,015
Jun 11
All of a sudden Duster is on all Social Media!
The Renault Duster 1.0-litre far exceeded my expectations because 99 HP and 166 Nm don’t sound much on paper but the reality is very different because this engine from the Kiger has been retuned. Being a 3-cylinder unit, the engine has its own share of vibrations. However, the performance is superb to say the least. I really loved pushing this car hard and the manual gearbox is a delight. Smooth clutch and slick shifts. The engine has a strong surge at 2000 RPM and the car is quick off the line. Lovely car to drive and the ride handling balance is anyway a strong USP. For under ₹16 lakh for the top end 1.0-litre, this is better than some offerings like the Venue and Sonet because you get a bigger and more stable car. For people who want AT or 160 HP on a budget, there’s a new Evolution 1.3 AT variant at around Rs. 14.5 lakh ex-showroom.
12
Mit retweeted
Heartfelt gratitude to Hon'ble Prime Minister Shri @NarendraModi ji and the Union Cabinet for approving Ahmedabad Metro Rail Phase 2A (Koteshwar Road–Airport Corridor). This project will enhance connectivity, improve commuter convenience, reduce congestion and contribute to cleaner, more sustainable transportation for the people of Ahmedabad and Gandhinagar. Metro rail has emerged as a symbol of efficient, safe and sustainable urban mobility, transforming the way people travel and connect. The expansion of the Metro network will further catalyse growth across the region and strengthen Ahmedabad-Gandhinagar's emergence as a modern, future-ready urban hub.
1
86
220
3,495
PM Modi presents his 12 year Report Card: ✈️ Airports 2014: 74 2026: 160 🛣️ Expressways 2014: 1,000 km 2026: 6,700 km 🚇 Metro Cities 2014: 5 2026: 20 🛡️ Defence Exports 2014: ₹700 crore 2026: ₹23,000 crore 🌐 Internet Users 2014: 25 crore 2026: 100 crore 📱 Mobile Phones 2014: Mostly imported 2026: 33 crore handsets manufactured annually 💳 Digital Payments 2014: Negligible 2026: India ranks No.1 globally ☀️ Solar Capacity 2014: 5 GW 2026: 150 GW PM Modi: "Tasks that once took decades are now being completed in months."💥
60
1,131
3,452
62,673
Jun 10
Much needed!!
China launches high-speed road sweeper that operates at 80 km/h and clears dust and stones in just 7 seconds.
14
Mit retweeted
🚉 Ahmedabad Railway Station gets a Smart Digital Luggage Locker Facility! 📌 Key Features ✅ 24x7 Automated Digital Cloakroom ✅ OTP-Based Secure Access ✅ 100% Cashless Payments (UPI, Debit/Credit Cards) ✅ 56 Smart Lockers & 3 Self-Service Digital Kiosks 📦 Locker Capacity 🔹 Medium (M): 12 Lockers 🔹 Large (L): 24 Lockers 🔹 Extra Large (XL): 20 Lockers 💰 Rental Charges 📦 Medium: ₹40 (3 hrs) | ₹70 (6 hrs) | ₹150 (24 hrs) 📦 Large: ₹70 (3 hrs) | ₹150 (6 hrs) | ₹200 (24 hrs) 📦 XL: ₹90 (3 hrs) | ₹170 (6 hrs) | ₹280 (24 hrs)
3
16
110
4,005
Mit retweeted
Ahmedabad Traffic Alert: ISKCON to KD Hospital Stretch is Now Zero-Tolerance 🔥🔥 🔹 SG Highway stretch between ISKCON Crossroads and KD Hospital gets strict zero-tolerance status. 🔹 The main goal is to clear congestion and make this entire route completely signal-free. 🔹 24/7 CCTV monitoring is active to catch wrong-side driving, overspeeding, illegal parking and road encroachments 🔹 Stopping your vehicle on the roadside for pick-up or drop-off is now completely banned. 🔹 Even a short halt in no-parking zones will result in direct fines or immediate towing. 🔹 Authorities plan to extend this Kota-style traffic model up to Vishala Circle in the future. Do you think these strict camera-based fines will actually stop people from breaking traffic rules? 💭 Follow @gujarat_plus_
6
17
184
6,934
Mit retweeted
4,850 kg of Suspected Duplicate Cow Ghee Seized in AMC Probe at Three Ahmedabad Units deshgujarat.com/2026/06/09/4…
1
9
34
2,868
Jun 9
Not needed 🙏
Every baby grows differently 🤍 Gentle support, tiny steps & big progress.
17
Mit retweeted
DO ROOFTOP WIND TURBINES HAVE ANY FUTURE IN INDIA? 1️⃣ Approximate cost: ₹1.3–1.5 lakh per kW installed 2️⃣ No government subsidy currently available for residential rooftop wind turbines 3️⃣ Performance depends heavily on local wind speeds and location 4️⃣ Coastal and open rural areas are likely to perform better than dense urban cities Can rooftop wind become a viable alternative to solar in India, or will it remain a niche technology? #WindEnergy #RenewableEnergy #India #RooftopWind
5
4
20
1,582
Mit retweeted
Ahmedabad's SG Highway has quietly emerged as one of India's largest private healthcare clusters. The 14 km stretch between Prahladnagar and Vaishnodevi Circle now hosts around 12 major hospitals and over 3,400 beds - roughly 240 beds per km, significantly higher than the city and state averages. The corridor is expected to see further growth with the expansion of Sola Civil Hospital and upcoming projects such as Adani Medicity and Torrent Hospital. 📷TOI
1
25
204
7,681
Mit retweeted
📍 Shetrunjay River, Gujarat
17
156
2,128
Mit retweeted
Where nature meets culture: Galteshwar Forest, Kheda At the sacred confluence of the Mahi and Galti rivers, beside the 800-year-old Galteshwar Mahadev Temple, a unique forest has emerged as a symbol of environmental awareness and conservation. 🔹 Located in Sarnal village, Galteshwar taluka 🔹 Features Shiva Linga, Bilva Patra, Nakshatra, Rashi, Navgraha & Panchvati forests 🔹 Includes Butterfly Garden, Bamboo Mist Tunnel, Maze Garden & Children's Play Area 🔹 Promotes nature education, tourism and recreation Today, Galteshwar Forest stands as one of Gujarat’s most distinctive eco-tourism destinations. 🌳✨
20
199
4,525