#Shaca were employed to undertake the #structuralalterations on this project. The progress photos were taken after we had demolished the rear façade and installation of the new timber joist flooring had commenced. We also completed the lift overrun.
#londonconstruction#concrete
#Shaca have completed the partial demolition of the existing roof and top floor and installed new #steelwork as part of the remodelling works. We have installed the in-situ RC slab and most recently we have poured the parapet ring beam. Galvanised plant deck also undertaken by us
As part of the #structuralalterations package, #Shaca are undertaking the slab demolition, reduced level dig and reinstatement of new pile caps. We also stitch drilled the obstructions which were in excess of a metre thick!
#londonconstruction#reinforcement
#Shaca#construction have recently completed new in-situ reinforced concrete staircases for two clients, as part of the overall structural alterations packages.
If you have any #structuralalterations coming up on your projects then please do not hesitate to get in touch!
We recently formed two voids in an existing slab as part of our structural alterations package. The workface needs a little tidy up and then it will be ready for others to install their rooflights.
#shaca#construction#londonconstruction#loveconstruction#demolition
An unusual detail we recently completed to tie-in an existing brickwork wall into a new concrete wall that we formed.
If you have any upcoming projects that require #structuralalterations then please do not hesitate to contact us!
#shaca#construction#londonconstruction