seed investing @lererhippeau 🇺🇸

Joined November 2025
18 Photos and videos
Madeleine Goldberg retweeted
New York or Nowhere 🧡💙🏀
Turns out you don't need to be a VC in the Bay Area to party with the NBA champs 🏆 We do that now in NYC, right @BenjLerer 😂
2
6
479
my boss is cooler than yours @BenjLerer managed to roll up to the office bright and early for our 1:1 despite hanging with the Knicks until 3am last night😎
Jalen Brunson’s toast at the Knicks team party last night: “F**k Wemby.” (h/t @SMHighlights1)
1
3
624
Madeleine Goldberg retweeted
ITS GAME DAY. NBA FINALS GAME DAY LETS GO KNICKS 🗣️🗣️🗣️🗣️
41
216
1,370
15,624
Madeleine Goldberg retweeted
🌕✨ This isn't a Giant Moon. It's one of the most difficult types of photographs in astronomy. Captured during the rare May 2026 Blue Moon, this image shows the full Moon rising behind Stonehenge using a technique called perspective compression. The Moon only looks enormous because the photographer was positioned miles away with an extremely powerful telephoto lens. In reality, the Moon was nearly 384,000 km from Earth. Stonehenge was built more than 4,000 years ago. And tonight, those ancient stones stood beneath the same Moon that humans have watched for thousands of years. The timing had to be nearly perfect. A few minutes too early or too late, and the alignment would be gone. Others capture thousands of years of history in a single frame. 🌌 📍Stonehenge, England
3
101
286
4,822
Madeleine Goldberg retweeted
I am proud to share that I have joined the Board of @nvca. The US startup ecosystem powers our economy by driving relentless innovation, creating millions of jobs and by giving birth to world-changing companies that generate trillions in value and global leadership. The @nvca plays a key role in making sure our community continues to thrive.
LH Managing Partner @erichippeau has joined @nvca's next board cohort. Eric will work with his fellow board members to advocate for the American entrepreneurial ecosystem, in Washington and beyond, to ensure policies are in place that allow founders and investors to work together productively as they scale the next generation of companies.
2
3
8
997
Madeleine Goldberg retweeted
One single thread of gold tied me to you 💫 Seen here by @NASAHubble is NGC 7714, a spiral galaxy located about 100 million light-years from Earth. The golden haze is made up of millions of stars stretching from the galaxy’s center and bridging to a nearby galactic companion.
62
746
4,364
234,309
Madeleine Goldberg retweeted
There’s a lot of alpha in putting your ego aside by being willing to be cringe, willing to fail in public, willing to ask for what you want and face rejection, etc.
198
606
5,377
631,037
Madeleine Goldberg retweeted
the industrial revolution made goods abundant. ai will do the same for services
120
221
2,602
323,036
i’ve been thinking about a concept I’m calling Barbell Distribution. many of the most valuable companies cluster at two GTM extremes - and the middle is getting squeezed...
5
3
87
141,650
the middle - hybrid enterprise sales - is enormously valuable (Databricks, Rippling, Ramp). but it’s where growth investors pour capital into repeatable outbound motions. at seed, signal is often weakest and entry math is hardest...
1
3
693
what connects both extremes: distribution that can’t be replicated by writing a bigger check. PLG wins because the product spreads itself. niche/complex wins because credibility and the relationship - or even product development - took years. in both cases, more money alone doesn’t buy growth
1
519
i love when enterprise AI that could have just enabled customers to build products/services decides to verticalize and build the products/services itself
1
316
like if your Claude is down and you decided to go touch grass
16
1,315
Steve Jobs in 1985: “Someday some student will be able to not only read the words Aristotle wrote, but ask Aristotle a question, and get an answer”
2
450
Madeleine Goldberg retweeted
Apr 15
Dear algorithm, show this to the most cracked engineers on this app
181
31
988
35,743
time to reindustrialize⚡️🇺🇸
Trying to bridge thoughts from different sources & podcast given the focus around the AI buildout. How much data center capacity is actually coming online per year — and who is absorbing it? I've been trying to square some numbers across multiple sources on real, energized gigawatts being added annually in the US, who's consuming them, and what we actually know versus what's estimated. The installed base FERC confirmed in their March 2026 State of the Markets report that US data center capacity exceeded 50 GW at year-end 2025. Industry estimates put total US capacity in the 35-40 GW range at year-end 2024 (Bain was at ~35GW, Morgan Stanley's model pegged it at 37 GW). That implies roughly 10-15 GW of net additions in 2025, a massive step-up from prior years. Total facility power, critical IT load, and hyperscale-only all produce different baselines — I haven't seen two sources use the same definition consistently. Frontier labs Brad Gerstner @altcap (investor in both @OpenAI and @AnthropicAI) says OAI and Anthropic have 1.5-2 GW each today, going to ~5 GW by year-end. @dylan522p at @SemiAnalysis (@dwarkesh_sp @dwarkeshpodcast Podcast, March 2026): Both at roughly 2-2.5 GW today. Both reach 5-6 GW by year-end 2026, OpenAI slightly higher. Both targeting ~10 GW by end of 2027. @sarahfriar disclosed 1.9 GW for OpenAI at year-end 2025. Anthropic's operational capacity is likely in the 1.5-2 GW range. On year-end targets, there's a wide gap between what's been contracted (Stargate US UAE, NVIDIA 10 GW partnership, CoreWeave, Google TPU mega-deal) and what will physically be energized by December. Dylan's 5-6 GW per lab is likely the more physically grounded number, built bottom-up. Per Dylan, Anthropic was conservative on locking up compute early while OpenAI signed aggressively with Microsoft, CoreWeave, Oracle, & even SoftBank Energy — so Anthropic has to now pay premium rental rates or go to lower-quality providers to catch up (but Gerstner's comments made it sound like the take rate wasn't that high). Neither leading lab owns or builds data centers. Their ~6 GW of combined incremental capacity in 2026 is physically built and operated by AWS, Google, Microsoft, CoreWeave, Oracle, and others but contractually dedicated to serving OpenAI and Anthropic workloads. Assume a meaningful chunk of AWS's disclosed additions goes to Anthropic's Trainium/Rainier clusters, and a meaningful chunk of CoreWeave's build goes to OpenAI. CoreWeave also recently signed a multi-year agreement to support Anthropic's Claude models, with new capacity coming online in 2026. Frontier lab demand and hyperscaler supply overlap — they are not additive. Hyperscaler disclosures on physical delivery These are a mix of US and global figures, and facility power vs. IT load definitions vary across companies. Amazon (AWS): @ajassy disclosed AWS added 3.9 GW of new power capacity in 2025 (1.2 GW in Q4 alone). Operating from a base of roughly 8 GW at year-end 2025, with a target to double total capacity by year-end 2027 implying ~16 GW total. Still describes demand as outpacing supply. AWS operates 38 regions across 27 countries = the 3.9 GW is almost certainly global, not US-only, though the US is the clear majority. Microsoft: @SatyaNadella's team disclosed over 2 GW added in FY2025, with roughly 1 GW brought on in the December quarter alone. 400 data centers globally. Also targeting roughly double capacity by 2027. SemiAnalysis reported that Microsoft paused over 3.5 GW of capacity that would have been built by 2028, though Reuters/TD Cowen put the figure lower at ~2 GW of terminated leases in the US and Europe, and Bernstein says actual cancelled contracts total only "a couple hundred megawatts." The precise number is disputed. The directional point is clear that Microsoft was recalibrating its self-build vs. lease mix but now seems to be building again. Google (Alphabet): @sundarpichai and team guided 2026 capex at $175-185B, nearly double 2025. No explicit "we added X GW" disclosure comparable to AWS. Dylan describes them as "still capacity constrained" and acting fast = buying an energy company, putting down turbine deposits for 2028-29, negotiating long-term power agreements. A large chunk of new capacity is going to TPUs for internal products (Gemini across Search, Android, Workspace) and the Anthropic deal (~1 GW in 2026, ~3.5 GW from 2027). Without a disclosed GW figure, I'd estimate 3-5 GW of 2026 additions based on capex trajectory similar to the other giants. Meta: @finkd guided $115-135B in 2026 capex, nearly double 2025. Building for internal AI workloads (Llama training, inference across Instagram-WhatsApp-Threads) Meta Superintelligence Labs. 1 GW campus in El Paso (investment scaled from $1.5B to $10B), 1 GW campus in Lebanon, Indiana, JV in Louisiana (~$27B estimated), Prometheus bringing 1 GW online in 2026. On top of the self-build, Meta committed $35.2B to CoreWeave across two deals for third-party capacity. Independent builders and neoclouds @elonmusk's @xai: Colossus 2 in Memphis is targeting 1-2 GW of capacity to support 550,000 next-gen Nvidia chips, scaling to 1 million GPUs. Deployed 35 natural gas turbines generating 420 MW behind the meter to work around grid constraints. @CoreWeave's team added 490 MW across 11 data centers in 2025 (260 MW in Q4). Total active capacity hit 850 MW at year-end against 3.1 GW contracted. Planning $30-35B of 2026 capex. Also acting as lead builder on the 1.2 GW Stargate Abilene campus for OpenAI. @nebiusai: Tracking toward 800 MW - 1 GW of available capacity in 2026. 310 MW facility in Finland. Meta agreed to buy $12B of AI computing capacity from Nebius by 2027, with an option for an additional $15B over five years — up to $27B total. Sense-checking the total - A few different ways to triangulate: Morgan Stanley forecasts ~24 GW of global additions in 2026 * 50-60% US = ~13-14GW. BloombergNEF has something like ~8-10GW of IT Load * 1.4 PUE = ~12-13GW. @climatetech_vc data showing at least 16 GW of US data center capacity slated to come online in 2026 across 140 projects but warns 30-50% may face delays due to power constraints and equipment shortages. Crude capex math: $600-700B in 2026 hyperscaler capex at roughly $40-50B per GW of fully-built capacity also implies mid-teens GW. That's an imprecise conversion as capex covers equipment, data center shells, chips, and land that enter service across different years but it provides another directional anchor. Colliers reported that North American data center absorption hit 15.6 GW in 2025, double the 2024 level. The narrower CBRE primary-colocation-market figure of 2.5 GW only captures a subset of traditional leased space and misses hyperscaler self-build, behind-the-meter neocloud facilities, and training clusters entirely. @EpochAIResearch's frontier data center tracker confirms the step-function: most of the largest campuses (e.g., Meta Hyperion at 2.2 GW, Microsoft Fairwater above 1 GW) don't fully arrive until 2027-2028. It seems a reasonable base case for 2026 US net energized capacity additions: ~15 GW vs. bear case 12-13 GW (permitting delays push energizations into 2027) vs. bull case 18-20 GW (everything announced delivers on schedule). The bucket breakdown: Frontier labs (OpenAI Anthropic): ~6 GW. Physically built by AWS, Google, Microsoft, CoreWeave, Oracle but contractually dedicated to OpenAI and Anthropic training and inference workloads. ~3 GW incremental per lab. Hyperscaler first-party AI: ~4-5 GW. Microsoft Copilot across 900M MAUs and GitHub Copilot. Google Gemini across Search, Android, Workspace plus DeepMind. Amazon Alexa rebuild, internal retail/logistics AI. Meta ad retrieval, recommendations, Llama training. Third-party AI cloud and independent builders: ~2-3 GW. xAI and Meta as external customer of CoreWeave/Nebius. Enterprise builders. Sovereign AI. Inference demand through Bedrock, Vertex, and Foundry APIs. Non-AI cloud overbuild/commissioning lag: ~2 GW. Traditional enterprise workloads plus power energized ahead of full rack load. Where I'm probably wrong and why the number could be higher than 15 GW ~90% of the incremental build in this framework is AI-related. Only ~1 GW goes to traditional cloud. The most likely source of upside: enterprise inference and cloud AI demand growing faster than this would model. Oracle's remaining performance obligations have exploded to $523B. AWS's non-Anthropic AI business is running at $15B ARR. Amazon's custom chip business alone is a $20B run-rate. The absorption data supports this. Colliers/Jefferies put North American absorption at 15.6 GW in 2025 = demand is tracking much closer to total additions than people assume. If enterprise adoption of AI APIs is inflecting harder than I'm capturing, the "third-party AI cloud" and "hyperscaler first-party" buckets could each be 1-2 GW bigger, pushing total additions toward 18-20 GW. If the enterprise inference layer is scaling as fast as the hyperscalers are betting (Copilot seats, Gemini in Search, Claude Code adoption, agentic workflows) then 15 GW is conservative and $600B in 2026 hyperscaler capex is well supported. Lot of figures and disclosures so I'm sure I slipped up along the way. What did I get wrong? Anything else to include?
1
2
378