$CEIN @Camber_Energy @VikingOzone @VikingEnergy @SimsonMaxwell The sleeping Giant ⛓️💥🐦🔥♾️
Bridgeview Resources (BVR) 👀
Broken Conductor Protection Technology—goes by BCPT
The most recent one’s from February twenty-seventh, twenty twenty-six. Camber’s subsidiary Viking ran a live end-to-end validation on a real energized one hundred thirty-eight kV transmission line, sixty-three miles long, run by a U.S. utility.
They simulated single-phase open-conductor faults—like a broken line—at both ends. The BCPT, plugged into those SEL-four eleven L relays, spotted it and tripped in under one second everywhere. No false alarms either—tests on nearby lines didn’t trigger junk. Everything checked out via relay logs and waveforms, under actual load too. Press release dropped March fourth