Work continues on the Tenkiller Bridge replacement project near Gore, Oklahoma, June 2, 2026, where crews are placing ultra-high performance concrete between the pre-cast panels to form the bridge deck.
ALT A concrete bridge stretches into the distance under an overcast sky. Metal guardrails line both sides of the structure, leading toward a piece of equipment or gate structure at the far end. Water is visible beyond the railings, and the scene appears to show infrastructure work at a dam, spillway, or navigation structure.
ALT Two workers stand on a concrete bridge deck during maintenance work. One worker in a high-visibility safety vest and hard hat stands near equipment, while another works beside a sloped metal structure. An overhead crane with hanging hooks spans the top of the image. Guardrails line both sides of the bridge, and the cloudy sky creates an industrial worksite setting.