Update: A 25 cm leakage has been detected at the bottom of the 750mm dia pipe. Welding repairs will commence soon.
Water supply update:
1) 5:30 PM supply to Khar West, Danda Koliwada, Chuim Village, Dandpada, and Gazdarbandh is deferred. (1/2)
Update: Lucky Junction, Bandra West
Leakage on the 750mm Dia Pali Hill reservoir inlet identified via sounding method. Excavation & repair work starts today in coordination with Mumbai Traffic Police.
Any disruption in the evening water supply will be (1/2)