PER IHS MARKIT:
AOF 13.3MMCF/D
ACTUAL EXPECTED PRODUCTION 2.5MMCF/D
The lack of accountability in some of these companies is sad to me. Having actually played in the helium game I can say with confidence, Royal Helium isn't where I would put my cash
Independent production test results by IHS Markit were originally published by IHC in October 2021. (We, RHC took over IHC in July 2022)
Our (after takeover) contracted engineers Obsidian Engineering and Arjae Design Solutions with GLJ 3rd party reservoir engineers designed, (now building) the processing plant specifically based upon flow rates, pressures, composition mole fractions, porosities, permeabilities etc for both wells.