Orient Energy Systems Pvt. Ltd. Limited is one of the leading multinational engineering company.

Joined February 2020
295 Photos and videos
start/stop procedures, practical demonstrations to enhance operational efficiency/reliability. We appreciate the active participation of Dawn Foods team and remain committed to supporting our customers through continuous learning. (3/3) #CustomerTraining #TechnicalTraining #OES
5
As part of this commitment, OES successfully conducted a comprehensive training session on Cummins Diesel Generators for our valued customer, Dawn Foods, at OES Lahore Training Centre. The session covered DG operation, preventive maintenance, safety practices (2/3)
12
At OES, we believe that delivering reliable power solutions goes beyond supplying equipment—it also means empowering our customers with the knowledge and skills to operate and maintain their systems effectively. (1/3)
2
The support and expertise provided by the RESCUE 1122 team in enhancing emergency preparedness within our organization are sincerely appreciated. (2/2) #SafetyFirst #FirstAidTraining #FireSafety #EmergencyPreparedness #WorkplaceSafety #Rescue1122 #EmployeeDevelopment
4
A Firefighting and First Aid Training session in collaboration with the RESCUE rescue 1122 training team has been conducted in OES. The session provided both classroom learning and practical demonstrations, equipping our employees with essential emergency response skills (1/2)
5
This achievement reflects our commitment to delivering reliable, energy-efficient HVAC solutions through technical excellence and seamless project execution. (4/4) #OrientEnergySystems #OES #HVAC #EngineeringExcellence #ProjectExecution #CoolingSolutions #EnergyEfficiency
10
the chillers arrived in Karachi and were safely unloaded and positioned at site under the supervision of OES engineering and service teams. (3/4)
6
Following successful Factory Acceptance Testing (FAT) in Malaysia, conducted in collaboration with SEM Engineers and the client’s representatives (2/4)
3
OES has successfully received and positioned two high-efficiency Dunham-Bush Holding Bhd Water-Cooled Screw Chillers at the Meezan Bank Head Office in Karachi, marking a key milestone in the ongoing HVAC upgradation project. (1/4)
13
installation, commissioning, and integration of a microgrid system for energy management. With a renewable energy portfolio exceeding 1GW across wind and solar projects, OES continues to support industries in reducing energy costs. (3/3) #WindEnergy #RenewableEnergy #OES
15
Developed in collaboration with Burj Clean Energy Modaraba, the project reflects a strong commitment to cleaner and more efficient energy solutions for the industrial sector. OES delivered the project on a turnkey basis, including engineering, procurement, (2/3)
11
Successful completion and inauguration of the 7.5 MW Captive Wind Power Project for Power Cement Limited marks another important step towards sustainable industrial growth in Pakistan. The project was inaugurated on 13 May 2026 by Mr. Arif Habib. (1/3)
11
The upgraded system has delivered strong results, including up to 75% recovery, reduced operating costs, extended filter life (48 hours to 15 days), elimination of CIP cycles and improved energy efficiency. (4/4) #WaterRecycling #EngineeringExcellence #ProcessOptimization #OES
24
Through a comprehensive revamping strategy—including hydraulic re-engineering, membrane optimization, system alignment, and automation—OES restored the plant to optimal performance, reducing membrane usage by 33% while significantly improving efficiency. (3/4)
20
The plant, despite high initial investment, was facing: 1. Low flow rates and poor recovery efficiency 2. High operational costs (power and consumables) 3. Frequent maintenance and unstable performance (2/4)
17
OES has successfully revamped an underperforming water recycling plant at Liberty Mills Limited (SITE Industrial Area), reinforcing its expertise in diagnosing complex system inefficiencies and delivering performance-driven engineering solutions. (1/4)
19