Every decision made in schematic design without accounting for technology creates constraints that become progressively more expensive to fix.
Not because the technology changes. Because the building doesn't.
By the time you're at 60% CD, the TR is sized, the pathways are routed, and the MEP coordination is done. Moving anything at that point isn't a design revision — it's a change order.
The conversations that prevent this aren't complicated. They happen at SD, before the drawings lock in what's possible. They take 20 minutes and save projects six figures.
We've been having those conversations with architects and engineers for 40 years.
If your next project involves any technology scope — IT, AV, security, DAS, smart building systems — the best time to bring us in is now.
→
na2.hubs.ly/H05WBcH0
#TechnologyDesign #AEC #ChangeOrders #SchematicDesign