Another BigDev oopsie recently from a tower project.
Oopsie 1: During leaseup LL realizes they have to deliver stepped down power from electrical room to tenant space per work letter. Except the transformer won’t fit in the electrical room. No one designed space for it.
Oopsie 2: While searching for where to put this beast it’s realized the post tension slab was VEd down from original plans to a lesser load. Transformer is in fact too heavy per sq inch to just “sit” on the slab somewhere else.
Sometimes I think “man, I could never compete with those big devs. Way too smart.
Then I have conversations like this where somehow a ~massive~ project gets built and no one considered how plumbing drops would impact parking deck clearances.
(Wish I could show the photos to really drive this one home)