#PowerCrisis | Intensifying heat wave has put immense pressure on Jammu’s power supply system, with overloaded transformers and aging infrastructure causing frequent outages in several areas, including Janipur, Talab Tillo, Gol Gujral, Sunjwan, Narwal, Bakshi Nagar and Satwari.
#Jammu#PowerSupply#HeatWave#ElectricityCrisis#JammuAndKashmir
The 765/400 KV Air-Insulated Substation at Virudhunagar, Tamil Nadu, helps anchor the power network for the Chennai-Kanyakumari Industrial Corridor. MEIL Group built this facility for TANTRANSCO under a full turnkey contract, installing seven 500 MVA transformers, high-voltage switchgear, and SCADA systems. Now that it is operational, the substation keeps the grid stable, links renewable energy sources to the main line, and prevents power losses across industrial hubs and towns.
#Substation#PowerNetwork#Virudhunagar#TamilNadu#TANTRANSCO#MeghaEngineering#MEIL#MEILGroup
man, i just like the way it looks on a shelf, that's the only reason i buy physical these days. personally, i'd have the top two shelves specifically for transformers i've collected over the years, that's the only thing i'd do differently.